Law 45 Real Estate Buyer Protection in Panama 2026

PanamaProp14 min

Last updated: April 24, 2026

Buying an apartment in Panama is the most important economic transaction of most people's lives. Law 45 of October 31, 2007 (Consumer Protection and Competition Defense Law) grants the buyer specific rights against the developer: 10-year warranty on structure, 5-year warranty on installations, protection against misleading advertising, the right to recover earnest money if the developer breaches, voidness of abusive clauses, and a dual remedy track (administrative via ACODECO + judicial via the Consumer Defense Tribunal).

This guide covers the full legal framework, real-world cases, complaint procedures, and a checklist of rights every buyer should know before signing the purchase promise. If you're evaluating buying apartments for sale in Punta Pacifica, Costa del Este, San Francisco, Obarrio, Bella Vista, El Cangrejo, or Marbella, read this article before signing any document. For complementary technical due diligence see due diligence buying apartment 2026; for the standard purchase process first-time Panamanian buyer step-by-step; estimate target value with PanamaEstimate.


Applicable Legal Framework

Law 45 of 2007: backbone of consumer rights

  • Full name: Law 45 of October 31, 2007, Consumer Protection and Competition Defense Law.
  • Governing body: ACODECO (Consumer Protection and Competition Defense Authority).
  • Specialized jurisdictional body: Consumer Defense Tribunal (created by Law 45/2007 Article 126 et seq.).
  • Nature of the rules: public order (Article 1). Provisions cannot be waived or modified to the consumer's detriment by private contract.

Complementary norms

  • Panama Civil Code: Articles 1072 (moratory interest), 1122 (earnest money), 1343 (hidden defects).
  • Law 6 of 2006: Horizontal Property Regime.
  • Law 88 of 2007: social-interest housing.
  • Construction Regulations (Resolutions of MOP and Municipality).
  • Laws 466 and 468 of 2019: Preferential Interest.

Fundamental Rights of the Real Estate Buyer

1. Right to truthful information (Articles 32-35)

The developer must provide clear, truthful, timely, and complete information about:

  • Total final price including all charges.
  • Actual physical characteristics of the property (sqm, layout, materials, finishes).
  • Delivery date with a specific date.
  • Warranties offered and their terms.
  • Financing conditions.
  • Buyer's contractual obligations.
  • Building manual (when PH applies).

Misleading advertising is prohibited (Article 34). If you buy based on advertised information that isn't fulfilled (e.g., '2BR with sea view' and the final unit lacks that view), you have the right to claim.

2. Right to safety and quality (Articles 32 and 61)

The acquired asset must comply with:

  • Applicable construction technical standards.
  • Specifications agreed in the contract.
  • Minimum housing safety standards (Construction Regulations).

3. Mandatory construction warranties

CategoryTermCoverage
10-year10 yearsStructural elements: foundations, columns, beams, slabs, load-bearing walls, structural waterproofing
5-year5 yearsSecondary elements: electrical, plumbing, central A/C, non-structural roofs, major finishes
1-year1 yearMinor finishes: paint, hardware, sanitary fixtures, included appliances, interior millwork

All start from effective delivery (not from promise signing).

4. Right to delivery in agreed time, form, and quality

Unjustified delay beyond the contractual grace period constitutes breach and triggers remedies.

5. Right to refund of earnest money on developer breach

If the developer breaches (delay, serious defects, impossibility of delivery), the buyer is entitled to:

  • Full refund of earnest money paid.
  • Legal interest from payment date through actual refund.
  • Compensation for demonstrable damages (substitute rental, double move, etc.).

6. Right to administrative and judicial complaint

  • Administrative path: ACODECO (free, typically 6-12 months).
  • Jurisdictional path: Consumer Defense Tribunal (6-18 months).
  • Ordinary civil path: Civil Courts (12-36 months).

Construction Warranties: Operational Detail

10-year warranty (decennial)

Legal basis: Civil Code Article 1343 + Construction Regulations.

Covers:

  • Foundations: settlements, sinking.
  • Columns and beams: cracks, deformations.
  • Slabs: structural cracking.
  • Load-bearing walls: support failures.
  • Structural waterproofing: leaks affecting structure.
  • Anti-seismic systems and reinforcements.

Joint and several responsible parties: selling developer + builder + structural engineer.

Obligation in the case of defect: full repair at no cost + consequential damages (temporary moving, damaged furniture repair, loss-of-use).

5-year warranty

Covers:

  • General building and unit electrical installations.
  • Plumbing (potable water, wastewater, rainwater).
  • Central A/C systems.
  • Non-structural roofs and their waterproofing.
  • Major finishes: high-quality flooring, structural cladding.
  • Exhaust systems (bathrooms, kitchens).
  • Elevators (in coordination with maintenance company).

1-year warranty

Covers:

  • Paint: peeling, staining.
  • Hardware: doors, windows, locks.
  • Sanitary fixtures: toilets, sinks, showers.
  • Included appliances: refrigerator, oven, washer if part of sale.
  • Interior millwork: closets, kitchen cabinets, interior doors.

Hidden defects (Civil Code Article 1343)

Defects not visible at purchase that the seller knew (or should have known) and didn't disclose. Term:

  • 6 months from defect discovery to initiate the claim.
  • But only if the warranty terms (10/5/1 years) have not lapsed.

Common examples: hidden leaks in walls, intermittent shorts, drainage problems, undisclosed thermal/acoustic insulation failures.


Pre-Construction Delivery Delay

Contractual term vs. grace period

Typical Panama purchase promise contracts establish:

  • Estimated delivery date (e.g., December 2025).
  • Grace period: 90-180 additional days without penalty (e.g., through June 2026).
  • Day 1 of breach: end of grace period (e.g., July 2026 onwards).

Available remedies

  1. Specific performance:

    • Demand delivery + moratory interest.
    • Additional damages: demonstrable substitute rental, double move, extra mortgage interest.
  2. Contract rescission:

    • Full earnest money refund.
    • Interest from payment date.
    • Damages compensation.
    • Process costs.

Recent 2022-2025 precedents

The Consumer Defense Tribunal has ordered:

  • Full earnest money refund + 5% annual interest + damages compensation in cases of unjustified delay > 12 months.
  • 30-50% of fines withheld by ACODECO in cases with associated misleading advertising.
  • Developer obligation to assign equivalent alternative unit if impossibility of delivery in original project.

Practical buyer mitigations

  • Document each milestone (emails, WhatsApp, construction photos).
  • Inspect personally every 3 months.
  • Keep contract + addendums + approved plans + payment receipts in a file.
  • Consult an attorney if delay exceeds 6 months past the grace period.
  • Consider diversification: not all your purchases in pre-construction; mix with resale.

Earnest Money: Types and Effects

Type 1: Confirmatory earnest money (general presumption)

  • Amount given as evidence of contract conclusion.
  • If buyer withdraws: forfeits earnest money.
  • If seller withdraws: returns earnest money + equivalent (double).
  • Typical: 5-15% of price.

Type 2: Penitential earnest money (requires express clause)

  • Allows either party to withdraw.
  • Buyer withdraws: forfeits earnest money.
  • Seller withdraws: returns earnest money doubled.
  • Similar effect but explicit as a withdrawal right.

Type 3: Penal earnest money (requires express clause)

  • Functions as a penalty clause.
  • No free withdrawal.
  • Forfeited only on culpable breach.

Mandatory earnest money refund

In cases of:

  1. Developer breach (delay > grace, serious defects, unilateral change of material characteristics).
  2. Supervening impossibility not attributable (force majeure: land subsidence, expropriation, natural disaster).
  3. Consent defect (fraud, essential mistake, duress at the time of contract).
  4. Regulatory non-compliance (developer without MOP/Municipal permits, illegal works, apartment doesn't match approved plan).

In these cases, refund plus damages indemnification.

Procedure to recover earnest money

  1. Formal notice to developer via certified letter or burofax with refund request + basis.
  2. Response window: 30 calendar days.
  3. Without refund: ACODECO claim or Consumer Defense Tribunal lawsuit.
  4. In parallel: precautionary attachment on developer assets if there is insolvency risk.

Abusive Clauses: What to Identify and Negotiate

10 common abusive clauses (void by Law 45/2007 Article 88)

  1. Unilateral price modification post-contract.
  2. Unilateral specification changes ('materials of equivalent quality').
  3. Anticipated waiver of warranties, hidden defects, or statutory periods.
  4. Open-ended delivery date or subject to 'developer convenience'.
  5. Improper retention of earnest money when developer breaches.
  6. Unfavorable jurisdiction (disputes in distant venue from consumer).
  7. Waiver of the right to file at ACODECO.
  8. Undisclosed additional costs ('documentation', 'processing', 'deed' added post-signing).
  9. Waiver of moratory interest for developer delay.
  10. Mandatory arbitration with excessive cost to consumer.

Practical consequence

  • Abusive clauses are void as a matter of law.
  • Voiding a clause does NOT invalidate the entire contract, only the specific clause.
  • You can invoke nullity at ACODECO or Tribunal even after signing.

Recommended pre-signing protocol

  1. Read the full contract (not just the seller's summary).
  2. Get a copy to review for 5-7 days with an independent real estate attorney (not the developer's).
  3. Identify clauses matching the 10 traits above.
  4. Negotiate removal of abusive clauses (many developers concede).
  5. Document the final signed version and all addendums.

ACODECO Complaint Process

Step 1: Document preparation

Collect:

  • Signed purchase promise contract + addendums.
  • All payment receipts (earnest money + installments).
  • Communications with developer (emails, WhatsApp, letters).
  • Current apartment/building photos.
  • MOP/Municipality approved plans.
  • Building manual (if PH applies).
  • Independent appraisals or inspections.

Step 2: Filing the complaint

  • Online: acodeco.gob.pa.
  • In person: Regional Office (main office at Albrook Mall in Panama City or regional by residence).
  • Specific complaint form with consumer data, provider (developer), amount, factual description, specific request.

Step 3: Mediation

  • ACODECO notifies the developer and schedules mediation in 30-60 days.
  • If both parties agree, a binding settlement is signed.
  • 45-55% of cases resolve here.

Step 4: Investigation

  • If no agreement, ACODECO opens a formal file.
  • Gathers evidence, requests information from developer.
  • 90-180 days typical.

Step 5: Administrative resolution

  • Resolution determining infraction + sanctions.
  • Fines from 100 to 50,000 balboas by severity.
  • Can order: earnest money refund, damages compensation, contract performance, information rectification, withdrawal of misleading advertising.
  • Sanctions do NOT replace civil remedy to consumer — they are cumulative.

Step 6: Appeals

  • Appeal to Administrative Tribunal (30 days).
  • Supreme Court Third Chamber (judicial review).
  • In parallel or alternatively: Consumer Defense Tribunal for an enforceable judgment.

Costs and timing

  • ACODECO process: free.
  • Recommended legal advice: 10-15% fees on recovery, or fixed $800-$2,500.
  • Total time via ACODECO: 6-12 months.
  • If escalates to Tribunal and appeal: 24-36 months.
  • Statute: 2 years from breach for administrative path.

Consumer Defense Tribunal

Jurisdiction and competence

  • Specialized tribunal created by Law 45/2007 Article 126 et seq.
  • Hears consumer-nature controversies.
  • Two instances: Court + Superior Tribunal.
  • Judgments enforceable in civil courts.

Process types

  • Oral summary: amounts up to $25,000, 3-6 month timeline.
  • Oral ordinary: larger amounts, 6-18 month timeline.

Available remedies

  • Specific performance.
  • Contract rescission + refund.
  • Damages.
  • Costs.
  • Civil fines for procedural bad faith.

Typical Cases and Probable Resolutions

Case 1: 14-month delay past grace period

  • Path: Consumer Defense Tribunal.
  • Request: rescission + earnest money refund + interest + damages (substitute rental $18,000).
  • Probable resolution: favorable to buyer, 8-12 months.
  • Total time: 14-18 months.

Case 2: Structural defect detected year 4 post-delivery

  • Path: ACODECO + Tribunal if needed.
  • Request: full repair + consequential damages (temporary moving, damaged furniture).
  • Coverage: 10-year warranty fully in force.
  • Probable resolution: order of full repair at developer/builder cost.

Case 3: Misleading advertising (renders vs. reality)

  • Path: ACODECO (strong in this category).
  • Request: rectification + compensation.
  • Probable resolution: developer fine + consumer compensation per material difference.

Case 4: Abusive unilateral material change clause

  • Path: Consumer Defense Tribunal.
  • Request: declaration of nullity + performance to original specifications or price reduction + damages.
  • Probable resolution: nullity declared, obligation to comply with originals or compensate the difference.

Case 5: Insolvent developer, abandoned project

  • Path: combined: creditor concourse + ACODECO + action against directors.
  • Request: earnest money recovery with priority over other creditors (consumer privilege).
  • Resolution: complex, 24-60 months typical. Partial recovery common (30-60% of earnest money).

Prevention: The Prudent Buyer Protocol

Before signing the purchase promise

  1. Verify developer status:

    • Public Registry: company existence, capital, directors.
    • ACODECO: prior complaint history.
    • News: lawsuits, delays in prior projects.
  2. Verify the project:

    • MOP/Municipality permits current and complete.
    • Approved plan matches what's offered.
    • Development financing (only buy in pre-construction if there's a bank-administered escrow trust).
  3. Review contract with an independent attorney:

    • Not the developer's.
    • Fees $300-$800.
    • Abusive clause checklist.
  4. Negotiate addendums:

    • Delivery deadline with daily penalty post-grace.
    • Detailed specifications (brands, models).
    • Written warranties with specific terms.

During pre-construction

  1. Inspect site every 3 months.
  2. Request progress certifications (MOP-stamped).
  3. Document communications (nothing verbal).

At delivery

  1. Inspection with an independent architect ($150-$400).
  2. Detailed checklist: finishes, installations, measurements.
  3. Don't sign acceptance certificate if defects remain.

Post-delivery

  1. Use the 1-year warranty (report every defect in year one).
  2. Keep the building manual.
  3. Document any hidden defect with discovery date.

Sources and Regulations

  • Law 45 of October 31, 2007 — Consumer Protection and Competition Defense. Official Gazette N° 25,914.
  • Panama Civil Code — Articles 1072, 1122, 1343.
  • Law 6 of 2006 — Horizontal Property Regime.
  • Laws 466 and 468 of 2019 — Preferential Interest.
  • ACODECO — acodeco.gob.pa.
  • Consumer Defense Tribunal — 2022-2025 case law.
  • Construction Regulations — Municipality of Panama + MOP.
  • Public Registry of Panama — verifying companies and properties.

This article is informational and does not replace professional legal advice. Each case has specific variables (contract, evidence, amount, time). Consult a real estate attorney specialized in consumer law before initiating a formal complaint.


Related Articles


Have a conflict with a developer? We connect you with an attorney specialized in Panamanian consumer law to evaluate your case. First consultation free, fees only on recovery (10-15%). Ask Alma describing the type of breach, earnest money paid, and elapsed time.

FAQ

Frequently asked questions

What is Law 45 of 2007, and what rights does it grant the real estate buyer in Panama?

Law 45 of October 31, 2007, known as the Consumer Protection and Competition Defense Law, regulates consumer relationships in Panama including new and resale home purchases. It establishes ACODECO (Consumer Protection and Competition Defense Authority) as the governing body and creates the Consumer Defense Tribunal as a specialized jurisdictional body. Key buyer rights: (1) Right to truthful, clear, and timely information about final price, actual characteristics, delivery timelines, warranties, and contractual obligations — Articles 32-35; (2) Right to the safety and quality of the asset as agreed — Articles 32 and 61; (3) Right to the construction warranty against hidden defects for 10 years on structural elements (foundations, columns, beams, slabs) and 5 years on secondary elements (plumbing, electrical, finishes) — Article 65 with Civil Code Article 1343; (4) Right to receive the property in the agreed conditions, time, and quality; unjustified delay is a breach; (5) Right to refund of earnest money and damages if the developer breaches, does not sell to third parties if reserved in writing, and does not unilaterally raise the price; (6) Right to administrative claim before ACODECO and judicial action before the Consumer Defense Tribunal or ordinary civil courts. Law 45/2007 is fail-safe: even if a private contract limits the buyer's rights, statutory rights prevail (public order norm — Article 1).

What mandatory warranties must a developer provide on a new home in Panama?

Panamanian developers have 3 categories of mandatory warranties under Law 45/2007 + Panama Civil Code Article 1343 + Construction Regulations: (1) TEN-YEAR WARRANTY on construction defects affecting structural elements: foundations, columns, beams, slabs, load-bearing walls, structural waterproofing. Covers defects compromising safety or habitability. Starts from delivery. Applies to both selling developer and builder. For proven structural damage, the developer must repair at no cost and answer for consequential damages (temporary moving, damaged furniture repair); (2) FIVE-YEAR WARRANTY on non-structural secondary elements: electrical installations, plumbing, central A/C systems, non-structural roofs, major finishes, non-structural waterproofing, exhaust systems; (3) ONE-YEAR WARRANTY on minor finishes, paint, hardware, fixtures, sanitary appliances, included appliances, interior millwork. Additionally, Law 6 of 2006 (Horizontal Property Regime) requires the developer to deliver the building manual with final plans, vendor list, certifications, and individual warranties when establishing the condominium (PH). Buyers can demand this manual at closing. Hidden defects not visible at purchase are protected by Civil Code Article 1343 — 6-month statute from discovery of the defect, but only claimable if the structural warranty periods (10/5/1 years) have not lapsed. To claim: formal notice to developer with photographic evidence and independent expert appraisal. If the developer doesn't respond satisfactorily within 30 days, file administratively with ACODECO or judicially.

What recourse do I have if the developer delays delivery of my pre-construction apartment in Panama?

Unjustified delay in pre-construction delivery in Panama can trigger multiple remedies under Law 45/2007: (1) Check the purchase promise contract: typically sets an estimated date + grace period (usually 90-180 additional days). Within the grace period there is no breach. After the grace period, there is developer breach; (2) Breach remedies — demand specific performance (delivery + moratory damages) with legal interest + demonstrable substitute rental expense + additional damages (double move, financial stress); or contract rescission with full earnest money refund + interest + damages + costs; (3) ACODECO administrative path: file a claim at the Regional Office. Processing 60-120 days. ACODECO can fine the developer (from 100 to 50,000 balboas depending on infraction) and order earnest money refund + compensation; (4) Consumer Defense Tribunal jurisdictional path: for complex cases or larger amounts. Process 6-18 months. Enforceable judgment in civil court; (5) Ordinary civil path: if you prefer to skip the consumer route, breach-of-contract suit in Civil Court. 3-year statute from breach. 2022-2025 precedents: the Consumer Defense Tribunal has ordered full earnest money refunds + 5% interest + damages in cases of unjustified delay exceeding 12 months. Recommendation: document every milestone (emails, WhatsApp, construction photos), personally inspect progress every 3 months, keep contract + addendums + approved plans + all payments in a file. Consult a real estate attorney if delay exceeds 6 months past the contractual grace period. See [first-time Panamanian buyer step-by-step](/en/blog/guia-primer-comprador-panameno-2026-paso-a-paso).

When and how is earnest money returned in Panama if the buyer withdraws or the seller breaches?

Earnest money in Panama is governed by Civil Code Article 1122 + the purchase promise contract + Law 45/2007 in consumer relationships. Three types with different effects: (1) CONFIRMATORY EARNEST MONEY (general presumption in Panama unless otherwise agreed): amount given as evidence of contract conclusion. If the buyer withdraws, earnest money is forfeited. If the seller withdraws, returns earnest money + equivalent amount (double). Typical 5-15% of price; (2) PENITENTIAL EARNEST MONEY (requires express contract clause): allows either party to withdraw losing the earnest money (buyer) or returning it doubled (seller). Similar effect but explicit as right of withdrawal; (3) PENAL EARNEST MONEY (requires express clause): functions as a penalty clause. No free withdrawal; lost only on culpable breach. Cases where mandatory full or partial refund applies: developer breach (no delivery, serious defects, unilateral change of material characteristics, delay beyond grace period); supervening impossibility not attributable to either party (force majeure such as land subsidence, expropriation); consent defect (fraud, essential mistake, duress); breach of applicable regulation (developer without permits, illegal works, apartment doesn't match approved plan). In these cases, refund plus damages indemnification. Procedure to recover earnest money: (1) Formal notice to developer via certified letter or burofax with refund request + basis; (2) 30-day response window; (3) If unreturned: ACODECO claim or Consumer Defense Tribunal lawsuit or civil suit. Recent precedents: 2024-2025 cases of stalled pre-construction projects resulted in full earnest money refunds via ACODECO in 4-8 months. When buyer is a natural person and developer is a company, the relationship is consumer and full Law 45/2007 protection applies. If both are private parties (no developer), only the Civil Code applies.

How do I file a complaint against the developer at ACODECO, and what can I expect from the process?

ACODECO is the administrative body that receives, investigates, and resolves consumer complaints. 2026 process for a real estate complaint: (1) DOCUMENT PREPARATION: signed purchase promise contract, addendums, payment receipts for earnest money and installments, communications with developer (emails, WhatsApp, letters), apartment/building photos, approved plans, building manual if applicable, independent inspections or appraisals; (2) FILING THE COMPLAINT: online at acodeco.gob.pa or in person at the Regional Office (Panama City main office at Albrook Mall, or regional by residence). Specific complaint form with consumer data, provider (developer), amount, factual description of breach, specific request (refund, performance, compensation); (3) Initial MEDIATION: ACODECO notifies the developer and schedules mediation in 30-60 days. If both parties agree, a binding settlement is signed. 45-55% of cases resolve here; (4) INVESTIGATION: if no agreement, ACODECO opens a file, gathers evidence, requests additional information from developer. 90-180 days typical; (5) ADMINISTRATIVE RESOLUTION: ACODECO issues a resolution determining infraction and sanctions. Fines from 100 to 50,000 balboas by severity. Can order: earnest money refund, damages compensation, contract performance, information rectification, withdrawal of misleading advertising. Sanctions do NOT replace civil remedy to consumer — they are cumulative; (6) APPEALS: to Administrative Tribunal (30 days) and ultimately the Supreme Court Third Chamber (judicial review). In parallel, the consumer can approach the Consumer Defense Tribunal for an enforceable judgment. Practical tips: file as soon as possible (2-year statute from breach for administrative path), document EVERYTHING from the first payment, keep communications with developer in writing (no verbal), retain an attorney if the amount exceeds $100,000 (10-15% fees on recovery). ACODECO cost: filing is free, but legal advice is recommended. Typical total time: 6-12 months for cases resolved via ACODECO; up to 24-36 months if it escalates to Tribunal and appeal.

Which contractual clauses are abusive or void under Law 45/2007 in Panama real estate contracts?

Law 45/2007, Article 88, declares abusive clauses in consumer contracts VOID AS A MATTER OF LAW, without need for judicial declaration. In Panamanian real estate contracts, common abusive clauses include: (1) Unilateral price modification post-contract (e.g., 'the developer may adjust the price based on cost variations'). Protection is absolute — the agreed price is binding; (2) Unilateral specification changes (e.g., 'the developer may swap materials for those of equivalent quality'). Only permitted if the buyer agrees in writing to each specific change; (3) Anticipated waiver of warranty rights, hidden defects, or statutory periods (e.g., 'buyer waives all claims for construction defects'). Void for violating public order; (4) Open-ended delivery dates or subject to 'developer convenience'. There must be a fixed date + reasonable grace period (no more than 12 months); (5) Improper retention of earnest money on developer breach (e.g., 'earnest money remains with the developer for any reason'). Buyer is entitled to refund if the breach is the developer's; (6) Unfavorable jurisdiction clauses (e.g., 'disputes resolved in remote jurisdiction X'). Law 45/2007 lets the consumer choose their domicile; (7) Waiver of the right to file with ACODECO. Void because ACODECO is a public-order body; (8) Clauses imposing costs not included in advertised price without clear prior disclosure (e.g., 'documentation', 'processing', 'deed' charges added post-signing); (9) Waiver of moratory interest for developer delay (Civil Code Article 1072 still applies); (10) Alternative dispute resolution (arbitration) clauses that impose excessive cost on the consumer or waive ordinary jurisdiction. Practical consequence: if you signed a contract with an abusive clause, do not comply in the abusive part; invoke nullity at ACODECO or Tribunal. Nullity of an abusive clause does NOT invalidate the entire contract, only the specific clause. To analyze your contract: (1) Read it fully before signing (not just the seller's summary); (2) Get a copy to review for 5-7 days with a real estate attorney; (3) Identify clauses with the 10 traits above; (4) Negotiate removal of abusive clauses (many developers concede); (5) If you signed without review, you can still invoke nullity post-facto. See also [due diligence buying apartment 2026](/en/blog/auditoria-due-diligence-comprar-apartamento-panama-2026).

Next step

Ready to invest in Panama?

Speak with a certified advisor to find the property that matches your investor profile and maximize your ROI.

Related searches

Explore apartments in Panama

Looking for an apartment in Panama?

Alma helps you find the property that fits your profile — based on what you just read.

Browse properties

Explorar todos los proyectos

Navega por nuestro catálogo completo de edificios en Panamá con filtros por zona, precio y ROI.

Ver catálogo de proyectos